Cost of downtime
Annual exposure from service unavailability across revenue, productivity and recovery.
VIRTEK · PRELIMINARY MODELLING
Twenty engineering models estimate an outcome range, expose assumptions and risks, and suggest a next step. They are a basis for discussion, not a commercial quotation.
Economics, capacity and resilienceCalculations stay in your browser · entered data is not transmittedCALCULATION SCENARIOS
Choose a challenge. Each scenario uses its own model and returns a working range rather than one overconfident number.
Annual exposure from service unavailability across revenue, productivity and recovery.
Compare external model API spend with an owned AI platform over a selected horizon.
Estimate released labour, annual value and payback for a robotics scenario.
Estimate storage for growth, change rate, retention, copies and safety reserve.
Estimate active sessions, compute resources and host count with N+1 resilience.
Estimate target hosts from the current estate, utilisation and consolidation density.
Economic range from lower manual effort and downtime after adopting managed operations.
Estimate when capacity reaches its threshold and the headroom needed for projected growth.
Estimate avoided loss from reducing recovery time for a critical service.
Usable and raw capacity over time with growth, protection, reduction and reserve.
Estimate per-branch and aggregate WAN bandwidth from the user traffic profile.
Estimate first-line staffing from demand, automation and productive occupancy.
Estimate RAM, CPU and database capacity for interactive and background 1C sessions.
Estimate GPU count and VRAM from request throughput, model size, performance and headroom.
Forecast database size, IOPS and replicas over the selected horizon with headroom.
Estimate expected annual loss before and after planned security controls.
Estimate IT load, facility power and cooling with PUE, growth and engineering reserve.
Estimate battery energy and UPS rating for the target load and runtime.
Compare current operations with a cloud scenario including migration, optimisation and avoided capex.
Estimate reclaimable licences and the net value of a SAM/ITAM programme.
WORKING MODEL
Annual exposure from service unavailability across revenue, productivity and recovery.
Preliminary result
Losses are treated as linear across the average incident duration.
Lower and upper bounds surround the base estimate with a scenario-specific uncertainty band. Change inputs to explore sensitivity rather than to tune a preferred answer.
Indirect loss, reputation impact and contractual penalties may raise the total.
This calculation is not a quotation, offer or guarantee. The range reflects input uncertainty and should be validated by an assessment, pilot or measurements before a decision.
VIRTEK · OUTCOME LAB
Explore sensitivity, save scenarios into a project, compare options and assemble an engineering report.
Impact of changing each input by ±20% from the current base estimate.
How to read the result
Move the result into a technical brief, select an assessment or compare it with a reference architecture.